From the West Coast to the Atlantic, Walco Industries brings robotic and handheld hydrodemolition to your site, with the equipment, water handling and certified crews.
Request a quote1-888-599-2526 · info@walcoindustries.ca
We go where the work is
Walco Industries is based in BC and has been delivering service, quality and safety for more than 40 years. Specialized concrete removal rarely happens next door to a specialist, so mobilizing across the country is a normal part of how we work.
Whether it's a bridge deck in the Maritimes, a dam in a remote location or a penstock on the side of a mountain, we bring a complete, self-contained hydrodemolition operation to your site. That includes Atlantic Canada: we mobilize to Nova Scotia, New Brunswick, Prince Edward Island and Newfoundland and Labrador with the same crews, equipment and procedures we use in BC.
Built to mobilize
- Self-contained power. Diesel-powered robotic units and high-pressure pumps run without grid power, which suits remote and undeveloped sites.
- Water handling solutions. Process water is collected on site, treated to neutralize its high pH and recycled back into the system, keeping consumption and runoff under control.
- One of North America's largest robotic fleets. Robotic units cover large surfaces quickly; lancing from 3,000 to 40,000 psi handles confined spaces and detail work.
- Specialized tooling. Centralizers for pipe and penstock interiors, rotating heads, extension kits, rail and track systems, circular power heads and a tunnel kit for arched profiles, as well as underwater solutions.
- Certified crews. Every operator trains under our in-house water blasting certification, built on Water Jet Technology Association (WJTA) recommended practices, at our training facility on Vancouver Island.
How mobilization works
- Scope review. You send RFP, RFI or RFQ documents, along with drawings and specifications; we confirm removal depths, areas, access and site conditions.
- Planning. We set pressures, volumes and equipment for the job, and plan water management and debris removal for your site.
- Mobilization. Equipment and crews travel to site. Typical lead time is 2 to 4 weeks from award.
- Baseline scan (if required). We capture the existing surface digitally using LiDAR before removal begins.
- Removal. Robotic and handheld hydrodemolition, with daily reporting to your site team.
- Verification. An after-scan measures what was removed against the baseline, for precise quantities and quality records.
Why owners and contractors choose hydrodemolition
Compared with jackhammering, hydrodemolition removes deteriorated concrete selectively, leaves rebar clean and undamaged, and produces a rougher surface that bonds better with repair materials. It also cuts vibration, noise and airborne silica. In our testing with the BC Construction Safety Alliance, silica exposure stayed below BC's limit.
See how hydrodemolition works →
Typical applications
- Bridge decks, soffits, parapets and elevated roadways
- Dam faces, spillways and penstocks
- Marine piers, docks, piles and pile caps
- Parking structures and industrial floors
- Tunnel linings and conduits
Have a project outside BC?
Send us your drawings and specifications, or call our team to talk through scope, access and scheduling.